EV Charging Infrastructure
New York State 2024 — charging ports, locations, EV stock and consumption. Networked charging infrastructure (93% of locations) is the foundation for V2G reserve market participation.
Total Charging Ports
18,643
Across 5,002 locations
DC Fast Charging Ports
2,165
4.05 ports/location avg
Level 2 Ports
16,438
3.62 ports/location avg
EV Stock
270K vehicles
2.6% of light-duty fleet
EV Energy Consumption
617 GWh/year
Growing with fleet electrification
Networked Locations
93%
4,641 of 5,002 locations — V2G-ready
V2G Reserve Market Potential
With 270K EVs consuming 617 GWh/year and 2,165 DC fast ports across NYC, vehicle-to-grid (V2G) aggregation can contribute meaningfully to the NYISO Dynamic Reserves 500 MW NYC floor requirement. Fleet-based V2G (airports, depots, ferries) offers the fastest path to 10-minute reserve compliance ahead of the 2027 implementation date.